Fast Intentions Long Tube Header *Teaser*
You guys havent seen the video yet?????
<object width="425" height="344">
<embed src="http://www.youtube.com/v/zy-Oa-kJThI&hl=en_US&fs=1&" type="application/x-shockwave-flash" allowscriptaccess="always" allowfullscreen="true" width="425" height="344"></object>
I'm just speechless
<object width="425" height="344">
<embed src="http://www.youtube.com/v/zy-Oa-kJThI&hl=en_US&fs=1&" type="application/x-shockwave-flash" allowscriptaccess="always" allowfullscreen="true" width="425" height="344"></object>
I'm just speechless
Sounds like the left wheel hitting the center reflectors on the ground?
__________________
Best Car Insurance | Auto Protection Today | FREE Trade-In Quote
__________________
Best Car Insurance | Auto Protection Today | FREE Trade-In Quote
sorry noob here with pipings.. i juz read all 22 pages.. can someone explain where does x-pipe goes in the exhaust system? lol
stock system = header > cats > y-pipe > mid-pipe > tail-pipe > mufflers
???
so this LTH replaces header + cats?
stock system = header > cats > y-pipe > mid-pipe > tail-pipe > mufflers
???
so this LTH replaces header + cats?
Yes, it replaces the header and cat.
Since the exhaust is extremely deep it's hard for the camcorder to pick up proper tones so it's probably backfire from lack of back pressure mixed with the deep tone. If you go with this setup, you'll get that a lot like a popping effect.
UPDATE-
I just received conformation that the tooling has shipped from Italy and will be state side sometime towards the end of next week. The distribution center will inspect the tooling to make sure that it is correct and then send it out to me (Hopefully) next Thursday or Friday. If that is the case, I should have the tooling within 2 weeks from today.
From there we need about 2-4 days to play with it and get all of the bends and rotations down. Once we have everything indexed, we will begin production.
The first set of fixtures/jigs will be completed by the end of today and I hope to have the second set of fixtures/jigs completed by the middle of next week. The reason we have decided to build 2 sets is to (Hopefully) speed production up! Obviously I have not built a production set yet. So, I can only try and calculate how long it will take to build each set. I am (hoping) that 2 people can produce 3-4 sets a day. We will not be working on them every single day due to the fact that we only have 4 people including (me) and we are almost two months behind just on cat back builds. I would like to have 5-8 sets mailed out every week if possible.
We at Fast Intentions, Inc. appreciate everyones continued patience...
Thank you, Tony
I just received conformation that the tooling has shipped from Italy and will be state side sometime towards the end of next week. The distribution center will inspect the tooling to make sure that it is correct and then send it out to me (Hopefully) next Thursday or Friday. If that is the case, I should have the tooling within 2 weeks from today.
From there we need about 2-4 days to play with it and get all of the bends and rotations down. Once we have everything indexed, we will begin production.
The first set of fixtures/jigs will be completed by the end of today and I hope to have the second set of fixtures/jigs completed by the middle of next week. The reason we have decided to build 2 sets is to (Hopefully) speed production up! Obviously I have not built a production set yet. So, I can only try and calculate how long it will take to build each set. I am (hoping) that 2 people can produce 3-4 sets a day. We will not be working on them every single day due to the fact that we only have 4 people including (me) and we are almost two months behind just on cat back builds. I would like to have 5-8 sets mailed out every week if possible.
We at Fast Intentions, Inc. appreciate everyones continued patience...
Thank you, Tony
UPDATE-
I just received conformation that the tooling has shipped from Italy and will be state side sometime towards the end of next week. The distribution center will inspect the tooling to make sure that it is correct and then send it out to me (Hopefully) next Thursday or Friday. If that is the case, I should have the tooling within 2 weeks from today.
From there we need about 2-4 days to play with it and get all of the bends and rotations down. Once we have everything indexed, we will begin production.
The first set of fixtures/jigs will be completed by the end of today and I hope to have the second set of fixtures/jigs completed by the middle of next week. The reason we have decided to build 2 sets is to (Hopefully) speed production up! Obviously I have not built a production set yet. So, I can only try and calculate how long it will take to build each set. I am (hoping) that 2 people can produce 3-4 sets a day. We will not be working on them every single day due to the fact that we only have 4 people including (me) and we are almost two months behind just on cat back builds. I would like to have 5-8 sets mailed out every week if possible.
We at Fast Intentions, Inc. appreciate everyones continued patience...
Thank you, Tony
I just received conformation that the tooling has shipped from Italy and will be state side sometime towards the end of next week. The distribution center will inspect the tooling to make sure that it is correct and then send it out to me (Hopefully) next Thursday or Friday. If that is the case, I should have the tooling within 2 weeks from today.
From there we need about 2-4 days to play with it and get all of the bends and rotations down. Once we have everything indexed, we will begin production.
The first set of fixtures/jigs will be completed by the end of today and I hope to have the second set of fixtures/jigs completed by the middle of next week. The reason we have decided to build 2 sets is to (Hopefully) speed production up! Obviously I have not built a production set yet. So, I can only try and calculate how long it will take to build each set. I am (hoping) that 2 people can produce 3-4 sets a day. We will not be working on them every single day due to the fact that we only have 4 people including (me) and we are almost two months behind just on cat back builds. I would like to have 5-8 sets mailed out every week if possible.
We at Fast Intentions, Inc. appreciate everyones continued patience...
Thank you, Tony
Are you going to alter the design? I mean the mass production set will it be any different than the current hand made version? Also i'd like to ask you when you get the machine would it be easier to start working on sedan version of the LTH?
Thanks.
For the production headers once you see them, you will notice that on each side one tube is on one piece from start to finish another tube will be in two pieces and the last tube will be in 3 pieces. What this does clean up the look,reduce build time and in the end reduce cost to you the consumer...
Thank you, Tony
Hey,
God willing, when we give a release date we do everything in our power to meet it!
I myself as a consumer HATE getting the run around and hearing another two weeks, another two weeks, another two weeks!!!
Say what you are going to do, and DO what you say!
Tony
God willing, when we give a release date we do everything in our power to meet it!
I myself as a consumer HATE getting the run around and hearing another two weeks, another two weeks, another two weeks!!!
Say what you are going to do, and DO what you say!
Tony
Hey,
God willing, when we give a release date we do everything in our power to meet it!
I myself as a consumer HATE getting the run around and hearing another two weeks, another two weeks, another two weeks!!!
Say what you are going to do, and DO what you say!
Tony
God willing, when we give a release date we do everything in our power to meet it!
I myself as a consumer HATE getting the run around and hearing another two weeks, another two weeks, another two weeks!!!
Say what you are going to do, and DO what you say!
Tony

Based on your experience, how long do you think those will take to get to Dubai? As long as they get to me before Shumby I'll be more than happy, even if that's in August hahaha


