when are these going out? I have an apt on Saturday to have them installed.
Last time I check those rhfc need to be made 4-6 weeks I think. Unless they told you they are being shipped you better start canceling that appointment lol
Last time I check those rhfc need to be made 4-6 weeks I think. Unless they told you they are being shipped you better start canceling that appointment lol
Last time I check those rhfc need to be made 4-6 weeks I think. Unless they told you they are being shipped you better start canceling that appointment lol
This is correct ^^
Originally Posted by ANMVQ
No sir, the full build on the BG was last week.
No, the full build was not last week for the Group Buy. The full Purchase Order was fully submitted, which wait times are 3-4 weeks on test pipe or cat builds. I do apologize if there was any confusion around this?